(Improper/faulty fitting) (Loose clamping) (leakage) (Reclamp properly)
(Too tight clamping) (Overheat, Shaft wear - leakage) (Re-insert and re-clamp as specified)
(Shaft to gland contact) (Abnormal noise, overheat, vibration —leakage) (Re-finish gland inner
surface so as to leakage obtain a specified clearance.)
(Thin or short packing ring) (Replace with normal ring)
(Eccentric) (Pulsation, early wear-leakage) (Adjust to eccentricity of 5/100mm)
(Shortage in number of packing rings) (Add packing ring)
(Use of worn sleeve) (Replace with new one)
(Forced insertion of thick packing ring) (Shaft wear-leakage) (Replace with normal one)
(Flaw on shaft surface) (Early wear - leakage) (Apply paper-sanding or filing to shaft, but limited
to small size)
------------------------------------------------------------
(Improper/Imperfect maintenance) (Liquid containing much slurry) (Shaft wear- Leakage)
(Check auxi device)
(Liquid solidification adhesion) (Corrosion) (Check auxi device, and replace with corrosion resistant
material.)
(Too high pressure) (Overheat, shaft wear, seizure - Leakage) (Check auxi device and replace with
high PV value seal)
(Too high revolutions) (Overheat, shaft wear, seizure - Leakage) (Cavitation, surging)
(Vibration-Leakage) (Adjust machine) (Faulty bearing) (Adjust bearing) (Dry operation)
(Overheat, shaft wear, seizure - Leakage) (Check auxi device) (Insufficient flushing/quenching)
(Overheat, adhesion, shaft wear - leakage) (Improper warming, cooling, heating)
(Imperfect centering/leveling in installation and piping) (Vibration, shaft run-out, early wear-
Leakage) (Adjust to specified values)
2 Answers
- csLv 51 decade agoFavorite Answer
(Improper/faulty fitting) (Loose clamping) (leakage) (Reclamp properly)
(裝配不當/裝配錯誤) (夾鬆弛) (滲漏) (適當地重新夾緊)
(Too tight clamping) (Overheat, Shaft wear - leakage) (Re-insert and re-clamp as specified)
(鎖太緊) (過熱, 心軸磨損–滲漏) (依規定重新置入並重新鎖緊)
(Shaft to gland contact) (Abnormal noise, overheat, vibration —leakage) (Re-finish gland inner surface so as to leakage obtain a specified clearance.)
(心軸接觸到填料) (異常的噪音, 過熱, 振動–滲漏) (重新加工填料內表讓滲漏保持規定間隙)
(Thin or short packing ring) (Replace with normal ring)
(墊圈太薄或太短) (更換正常墊圈)
(Eccentric) (Pulsation, early wear-leakage) (Adjust to eccentricity of 5/100mm)
(偏心) (抖動, 過度磨損–滲漏) (調整到5/100mm的偏心值)
(Shortage in number of packing rings) (Add packing ring)
(墊圈數短缺) (增加墊圈)
(Use of worn sleeve) (Replace with new one)
(使用磨損的套筒) (更換新套筒)
(Forced insertion of thick packing ring) (Shaft wear-leakage) (Replace with normal one)
(強行置入厚墊圈) (心軸磨損–滲漏) (更換正常墊圈)
(Flaw on shaft surface) (Early wear - leakage) (Apply paper-sanding or filing to shaft, but limited to small size)
(心軸表面有裂縫) (過度磨損–滲漏) (用沙紙或用銼刀銼平, 但僅限於小裂縫)
------------------------------------------------------------
(Improper/Imperfect maintenance) (Liquid containing much slurry) (Shaft wear- Leakage) (Check auxi device)
(維護不當/維護不完全) (液體含過多沉澱物) (心軸磨損–滲漏) (檢查輔助裝置)
(Liquid solidification adhesion) (Corrosion) (Check auxi device, and replace with corrosion resistant material.)
(液體固體化黏著) (侵蝕) (檢查輔助裝置, 並更換成抗侵蝕性材料)
------------------------------------------------------------
(Too high pressure) (Overheat, shaft wear, seizure - Leakage) (Check auxi device and replace with high PV value seal)
(壓力過高) (過熱, 心軸磨損, 卡住–滲漏) (檢查輔助裝置並更換成高PV值油封)
(Too high revolutions) (Overheat, shaft wear, seizure - Leakage) (Cavitation, surging) (Vibration-Leakage) (Adjust machine)
(迴轉過度) (過熱, 心軸磨損, 卡住–滲漏) (氣穴, 波紋) (振動–滲漏) (調整機器)
(Faulty bearing) (Adjust bearing)
(軸承錯誤) (調整軸承)
(Dry operation) (Overheat, shaft wear, seizure - Leakage) (Check auxi device)
(乾運轉) (過熱, 心軸磨損, 卡住–滲漏) (檢查輔助裝置)
2007-10-06 03:12:07 補充:
字數超過......
(Insufficient flushing/quenching) (Overheat, adhesion, shaft wear - leakage) (Improper warming, cooling, heating)
(沖洗或冷卻不足) (過熱, 黏著, 心軸磨損–滲漏) (不當加溫, 冷卻, 加熱)
2007-10-06 03:12:16 補充:
(Imperfect centering/leveling in installation and piping) (Vibration, shaft run-out, early wear-Leakage) (Adjust to specified values)
(安裝和管道系統的對中/或整平不完全) (振動, 心軸耗盡, 過度磨損–滲漏) (調整到規定值)
- 1 decade ago
〈Improper/faulty 配件) (寬鬆夾緊) (漏出) (Reclamp 適當)
(太緊緊夾緊) (過熱, 軸穿戴- 漏出) (再插入和re 鉗位依照被指定)
(軸對封墊聯絡) (反常噪聲、過熱, 振動 —漏出) (重漆封墊內在
表面以便漏出獲得指定的清除。)
(稀薄或短的包裝圓環) (用正常圓環替換)
(怪人) (脈動, 早期的佩帶漏出) (對怪癖5/100mm 調整)
(短缺數量上包裝圓環) (增加包裝圓環)
(對破舊的袖子的用途) (用新的替換)
(厚實的包裝圓環) (軸wear?leakage 的) 牽強的插入(用法線一個替換)
(缺點在軸表面) (早期穿戴- 漏出) (適用於紙鋪沙或歸檔軸, 但有限
對小大小)
------------------------------------------------------------
(Improper/Imperfect 維護) (液體包含泥漿) (軸穿戴漏出)
(檢查auxi 設備)
(液體固體化黏附力) (腐蝕) (檢查auxi 設備, 和用腐蝕替換抗性
材料。)
(太高壓) (過熱, 軸穿戴, 奪取- 漏出) (檢查auxi 設備和替換用
高PV 價值封印)
(太高革命) (過熱、軸穿戴, 奪取- 漏出) (氣蝕, 湧起)
(振動漏出) (調整機器) (有毛病的軸承) (調整軸承) (乾燥操作)
(過熱、軸穿戴, 奪取- 漏出) (檢查auxi 設備) (不足的flushing/quenching)
(過熱、黏附力, 軸穿戴- 漏出) (不正當溫暖, 冷卻, 加熱)
(不完美的centering/leveling 在設施和管道系統) (振動, 軸溢流, 早期穿戴
漏出) (對指定值調整)