希望有解答和中文翻譯..20點ths.. 是非5題 Batch production cannot be set up in assembly line fashion because processing involves many different jobs. A management information system is a system specifically designed to channel large quantities and numerous types of information through an organization. Reengineering... show more 希望有解答和中文翻譯..20點ths..

是非5題

Batch production cannot be set up in assembly line fashion because processing involves many different jobs.


A management information system is a system specifically designed to channel large quantities and numerous types of information through an organization.

Reengineering is typically chartered in response to a breakthrough goal.


The fewer the number of periods used in a moving average forecasting method, the more reactive the forecast is to the most recent demand changes.

The correlation coefficient "r" measures the strength of the linear relationship between two variables.

選擇3題

Which of the following is not a technique
or concept associated with capital budgeting?
a) net present value
b) break-even analysis
c) payback period
d) internal rate of return


A linear trend line for 12 months of data is y = 339.02 + 23.96x.
What is the forecast for the next period?
a) 339.02
b) 626.51
c) 650.50
d) none of the above

Using the data in Table 8.5, what is the cumulative error?
a) 1.80
b) 34.50
c) 6.90
d) none of the above